国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2769

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本欧美午夜 | 四虎影库在线播放 | 日韩精品亚洲专区在线观看 | 香蕉视频在线免费播放 | 日韩色视频在线观看 | 97一区二区三区四区久久 | 亚洲成av人影片在线观看 | 亚洲94vvv男人的天堂五月 | 伊人免费视频二 | 欧美深夜影院 | 日本草草影院 | 亚洲精品在线观看视频 | 日韩一级片免费看 | 久久成人免费大片 | 亚洲色视频在线播放网站 | 美女隐私免费视频大全照片 | 三级理论手机在线观看视频 | 与青春有关的日子完整版免费观看 | 白丝美女被狂躁免费漫画 | 出轨老男人h文 | 奇米四色7777 | 欧美一区二区视频三区 | 一区在线观看 | 东方800av| 日bb小说| 伊香蕉大综综综合久久 | 欧美 日韩 成人 | 一边吃奶一边啪受不了好爽 | 成人精品一区二区久久久 | 日韩欧美亚洲综合 | 亚洲福利一区二区 | 99久在线精品99re8热视频 | 欧美人与禽z0zo性伦交 | 亚洲午夜久久久 | 色妞bbbb女女女女 | 日日插夜夜爽 | 五月婷婷激情四射 | 日韩在线第三页 | 草莓视频污黄色 | 日韩视频在线观看免费 | 热久久国产欧美一区二区精品 |