国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3137

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩在线免费视频 | 青青青国产在线 | 色姝姝影院 | 奇米福利视频 | 日韩精品欧美亚洲高清有无 | 暖暖视频在线观看免费官网 | 手机看片日韩高清国产欧美 | 色婷婷丁香 | 中国男同gay国产twink | 免费三级黄色片 | 明星三级做爰在线观看 | 天天色天天色 | 午夜视频体验区 | 日本高清专区一区二无线 | 手机成人 | 一个人看的日本hd | 日韩欧美亚洲综合久久99e | yy午夜私人影院免费 | 在线观看免费毛片 | 欧美一级特黄视频 | 亚洲天堂手机在线 | 五月天婷婷激情网 | 色老成人精品视频在线观看 | 明星换脸高清一区二区 | 日韩伦理一区二区 | 星辰影院在线观看高清免费观看 | 欧美另类久久久精品 | 晚上正能量91香蕉 | 欧美亚洲人成网站在线观看刚交 | 农村妇女野外交性高清片 | 午夜aa| 久青草国产高清在线视频 | 欧美亚洲另类图片 | 日本性视频网站 | 性盈盈影视院 | 亚洲狼人综合网 | 伊人久久精品午夜 | 亚洲第99页| 日漫免费看 | 欧美又粗又大又硬又长又爽视频 | 日韩一级精品久久久久 |