Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:4141

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久精品影视 | 欧美在线中文字幕高清的 | 非洲黑妞性bbw | 调教强行破苞h女女 | 男人cao女人 | 鲁丝一区二区三区不属 | 色老板免费观看在线播放 | 亚洲欧美日韩国产综合久 | 天天做天天躁天天躁 | 欧美性猛交xxxx乱大交中文 | 99视频热| 日韩精品不卡 | 一级免费看片 | 日本漫画乌翼鸟大全火舞 | 天堂网在线网站成人午夜网站 | 天天爱天天插 | 有码中文字幕在线观看 | 欧美成人午夜免费福利785 | 在线背德的朋友中文字幕迅雷 | 免费看欧美日韩一区二区三区 | 天天爱天天插 | 日本高清在线一区二区三区 | 亚洲第一天堂无码专区 | 日本人成大片在线 | 天天欲色 | 亚洲欧美第一 | 在线久草视频 | 欧洲美女与动性zozozo | 大肥奶又白又大 | 色噜噜色噜噜天天拍一拍 | 色第一页 | 日韩天堂在线观看 | 图片专区亚洲欧美另类 | 三级黄色免费 | 白丝爆浆| 欧美三级午夜理伦三级中文字幕? | 日本韩国在线观看 | 吊操视频 | 99热免费 | 女警被绑被迫穿白丝女仆装 | 成人永久福利在线观看不卡 |