Foshan General Steel measuring program

Time:[2016-7-6]  Hits:4245

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 日韩欧美中文字幕一区二区三区 | 欧美视频在线网站 | 久久中文字幕乱码免费 | 欧美性野久久久久久久久 | 日韩欧美视频一区 | 欧美漏逼| 天天噜天天噜噜在线视频 | 怡红院在线视频精品观看 | 日日干夜夜骑 | 成人在线视频一区 | 欧美日韩精品国产一区在线 | 日韩亚洲欧美在线观看 | 亚洲精品在线免费观看视频 | 公交车被公公搞得好爽 | 一卡2卡三卡4卡3卡欧美 | 日韩一级片在线 | 99re这里有免费视频精品 | 日本妞欧洲 | 中日韩一级片 | 亚洲成av人片在线观看 | 青青草免费线观 | 萝l在线精品社区资源 | 男人的伸到男人里 | 亚洲视频一二区 | 亚洲欧美日韩精品久久 | 在线免费国产视频 | 男人猛躁进女人免费观看 | 天堂资源在线官网bt | 久久伦子沙发 | 日韩视频第一页 | 雪白丰满丝袜长腿白嫩在线 | 日韩欧美一及在线播放 | 久久艹国产 | 青青青青青免精品视频 | 天堂网www在线资源链接 | 四虎影片 | 五月天婷婷在线视频国产在线 | 日本成人免费 | 91久久免费视频 | 日本成人福利 | 男人操女人b视频 |