Precautions Foshan Steel Design

Time:[2016-6-15]  Hits:4716

Followed by the State to vigorously promote Prefabricated construction today, Foshan steel construction and more subject to our attention. The following are some of Foshan Steel watch point plan for us to see.
A Frame
⑴ portal frame should first determine whether there is a crane, such as plant demand resettlement process requests crane, you should note the following: ① column foot should be planned into a rigid column base; ② column should be planned into uniform section column; ③ between support columns by longitudinal horizontal crane load control programs, rather than a simple construction planning, when there are no less than 5 t crane when, should use steel support. As no crane portal frame, press columns and other practices planning a wedge, not repeat them.
Room ⑵ column support resettlement
Between the columns support the roof support pillar should be placed in the same room, so that the formation of a stable system of longitudinal frame, frame means to facilitate and increase the longitudinal stiffness. Support should be placed between the top of the second column by column from time to time, when placed in the second inter-column list when the appropriate placement of a rigid column tied, and the rigid tie rod and the wind column longitudinal orientation together, make a direct transfer wind loads. The turning point in the frame (single-span roof of the house and column capitals and some centers and multi-span pole in the house and the roof) should be set rigid Tied houses along the entire length. When larger span gantry in place between support columns should be appropriate to increase the number of rigid tie rods that support the angle is about 45 °. When the construction of functional constraint that can not be disposed between the support column, should be placed longitudinal frame. And that they've done this to make a rigid connection between the end of the column beams, studs and then cancel the support of engineering, construction make placement more flexible, with good results.
⑶ roof and wall construction
Roof and wall construction approach is to increase the stiffness of the frame, the key way to avoid the outer frame plane instability. Purlins, wall beams generally composed of cold-formed thin-walled structures formed when the column spacing less than 6 m, when designing a brace, more than 6 m, located two brace. Here should be mentioned especially the oblique bars, school diagram process, we often see a lot of steel structure manufacturers or planners provided the oblique strut bar without setting conditions. Factor is the construction concept is not very clear, because after construction mechanics, disposed between the oblique strut bar, before the formation of a stable system. In the roof, walls planned resettlement should also be noted bracing, bracing is not a luxury it is to avoid perverting the compression flange provided. Studies have shown the first portal frame damage due to pressure caused by perverting the largest flange. Oblique inner flange beams converge at the column flange and frame is the emergence of perverting vital parts, there is provided bracing is very important. In addition, the "portal frame light house steel construction technical specification" CECS102: 2002 (hereinafter referred to as CECS102: 2002) rules: oblique beams in the bottom flange of the compression zone is also set bracing, a distance not greater than the corresponding compression wing edge width of 16 (235 / fy) 0.5 times. When you press a general portal frame, purlin distance of about 1500 mm, a spacer is provided a bracing purlins above conditions can be satisfied.
⑷ shear key
"CECS102: 2002" rules: column anchor should not be used to withstand the horizontal shear column foot portion, the horizontal shear force by friction between the floor and the concrete foundation (friction coefficient desirable 0.4) or set shear joints bear. This is the time of our accounting mast, usually displayed warning: "Let Shear pedestal demand!"
Analysis of these factors, the main door is made generally lighter weight structure, column friction soles of the feet and between the concrete foundation is small enough to resist lateral wind loads and seismic effects, it should set the shear key. Usually the shear key beam with angle iron or steel, the shear bearing capacity of the cross section of the weld should be accounted for, columns and soles of the feet of open space between the surface of the foundation secondary grouting. Specifically refer to "many high-rise residential construction steel structure node configuration detail" 01SG519 diagram on page 30 to gather a large sample 1,2 practices.
Means for positioning the column anchor ⑸
This is the planners generally ignores questions and anchors positioned in engineering practice inaccuracy or rigid frame construction of the device difficult project case everywhere, we also encountered such a situation, and later had to reinforcement. Analysis of factors, notably the non-convergence between the anchors, the overall stiffness of the poor in the process of pouring concrete in the anchor inevitably shift. In response to these factors, taken before pouring concrete column anchor embedded fixation process, the specific approach shown in Figure 1. Mounting bracket and bolt to form a small lattice columns, positioned so the anchor would facilitate accurate. ⑹ wind columns and frame the current convergence of wind portal frame column planning practice there are two mistakes: one is the wind column and frame made of the same wind columns and beams or hinged frame or just then, the wind column to both wind and participate vertical load effect and the effect of the horizontal level. The planners do not usually do such a frame of longitudinal wind checking. This is done omissions load, Project Planning is a taboo. I think you are a force bent structure that clearly should not complicate it by force. This approach is defective; Another approach is to wind column and frame on one axis, but do not think that wind column vertical load effects wind between columns and beams with a steel frame after welding joints connected. This practice is still a part of the vertical load transmitted to the column of wind, and the steel sheet is small lateral stiffness, vertical load at the onset of the effect is difficult to ensure that there is barely after the land transfer the wind load. These two approaches have disadvantages. Here we recommend the following practices:
Plant selection do legal grids, Pin top frame column axis wind shifted 500 ~ 600 mm, wind through the column flange adapter plate is connected to the frame beam stiffeners and plate convergence and vertical stiffener open a long hole, use an ordinary bolt adapter bolts approach shown in Figure 2. Figure 2 wind column and frame adapter bulk sample
Plan 2 steel structure
Select ⑴ steel building systems
Common constructions of steel construction system can be divided into pure and construction - support systems into two categories. Highly selective and construction material systems, the use of closely-related features. This requires the construction engineer should work closely with the architect, when the construction of functional constraint can not be set because the support system should be used pure structure. Pure system configuration because no anti-sway support, two vertical and horizontal directions to satisfaction, "the construction of earthquake planning standards" GB50011-2001 (hereinafter referred to as "anti-regulation") Section 5.5 of the elastic layer between the displacement angle less than or equal request 1/300, beam the column in vertical and horizontal directions should just pick; because of "anti-regulation" section 8. 3.4 rule: "when the column in two mutually perpendicular directions and beam rigid connection, should use box-section" Therefore, use of pure construction system, usually planning to box column column column inside the box but the process of applying rust and proper maintenance difficult, which is steel construction planning a major problem. They are also trying to choose the column method of pouring concrete in the plan, but because the box column separator disposed stiffening node area, pouring concrete very difficult; on the other hand, the country is still in the concrete pipe during the discussion, common planning software can not be accounted for accounting theory in the Journal of the different. Based on the above factors when planning constructions of pure steel, most still use non - concrete box section column. Own labor process selected word column strong and weak axes are rigid convergence algorithm, according to the "anti-regulation" section of Article 8.3.4 of the text is selected, "should", see also the mainland large selection of drawings and Planning Institute said planning in spreadsheets method, but calculation results are not satisfactory, the elastic layer between the weak axis direction displacement angle is still unable to meet the request, "anti-regulation" of Article 8. 3.4. Because the box column in the structure of some tough, so the idea when planning a multi-layer steel cylinder-shaped house built try to use planning to construct - support system. Construction engineers and construction division to coordinate as much as possible, through resettlement in demand resettlement support bearing floor, elevator, which do not open big hole in the wall to achieve the support of stealth. The results indicate the accounting practice engineering, construction support displacement control effect is very good, so that in addition to the choice of column-shaped material saving, anti-rust, the use of easy maintenance, easy convergence weak axis direction, it is a useful method.
⑵ node Planning
Steel structure node planning is the key to planning steel structure. Hinged nodes simple, clear contact mechanics, where not too much to say, just focus on what connected node planning. Moment resistant convergence plan, "anti-regulation" 8 3.4 Recommended use Standard Figure 8. 3.4 - The node 1 in the form, in engineering practice are mostly chosen is such a node. This node has two accounts in accordance with: accurate programming and general programming. The difference between the two is that the former Reflections bending and shear webs, the latter only ponder web shear. Accurate planning law planning in practice, difficult bending webs satisfied request must be thickened to a large extent the web. The approach is very thick web of economic, so most use common project planning method, this accounting model Mechanics clear, simple accounting, but must pay attention to planning to take measures to strengthen the earthquake, such as the use of the plastic hinge relocation enhanced convergence or end of the beam away from the beam ends not far from the upper and lower flange beams weaken dog bone convergence. This is because, in the end without any reinforcing beam flange case, only ponder web convergence shear bolts bear, bear moment by the flange weld, then weld flange flexural capacity of only about 80% capacity BEAMS (that is, only beams with the section modulus of the beam flange section modulus of about 80%), then press the "steel construction planning standards" on page 3. 2.2, thinking construction site conditions weld strength reduction factor 0 is multiplied by the value of planning. 9, then the flexural capacity of the beam flexural capacity of Cohesion only 70% to 75%. This strong convergence node ratio is even lower 30% to 25%, in violation of the "earthquake not fall," the basic principles of earthquake "strong nodes, weak bars." Based on the above factors, it should be used "many high-rise residential construction steel structure node configuration detail" earthquake shown on page 19, 20 01SG519 portfolio strengthened approach.
Else
In our "anti-regulation" and "the Rules" the rules were not steel structure seismic level, just 12 minutes and 12 layers or less standard and two or more layers. I thought it was relative to our vast big difference around the fortification is characterized by inappropriate. Old "the Rules" in the multi-set size of a house built high-rise steel expansion joints no rules, only single industrial plant made some rules. These two points are the conceptual big question, "the Rules" does not emphasize these two points is appropriate.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 锌铝合金压铸-深圳压铸加工-铝挤压拉伸-压铸模具厂-广东誉格精密技术有限公司 | 液压油缸生产厂家-常州辰佰液压机械有限公司 | 自恢复保险丝_贴片保险丝_插件保险丝_力特保险丝_力特经销商_SMD贴片保险丝_一次性保险丝厂家—深圳市集电通实业有限公司 | 学汽修,学汽修技术,汽修培训班,汽车美容培训,汽车新能源技术培训-广州万通汽车培训学校[官方网站] | 宿州电机维修厂家,大型电机维修及二手电机修理到安徽鑫瑞特电机装备有限公司 | 山东腾达源金属材料官网-耐磨板nm400,nm400耐磨钢板,nm500耐磨钢板切割,耐候板批发,高强板现货【价格】 | 主题公园设计|主题公园规划|水上乐园设计|龙翔设计|龙翔景观|龙翔文旅|深圳市龙翔设计景观工程有限公司 | 新乡市大成数控机械有限公司| 厦门公司注册-提供工商登记记账代理服务和营业执照代办地址与注册流程及费用 | 在线播放国产精品|哔咔漫画破解版永久vip兑换码|免费黄漫画|女被黄漫扒衣服软件|91精品麻豆 | 意优教育|意大利留学中介_意大利留学费用_意大利申请条件_北京意大利语培训学校 | 无尘车间_洁净车间_净化车间_洁净室工程一站式净化服务商-深圳市美克威尔环境科技有限公司 | 雷达液位计_耐磨热电偶_蒸汽_柴油,汽油_天然气流量计_巴歇尔槽_一体化温度变送器-江苏翔腾仪表有限公司 | 江苏宇力医疗器械有限公司| 蒸汽发生器-电加热蒸汽发生器、燃油蒸汽发生器、燃气蒸汽发生器设备厂家-诺贝思蒸汽发生器 | 九洲集团官网(300040)—哈尔滨九洲集团股份有限公司 | 液压尾管悬挂器,机械式尾管悬挂器价格,石油套管扶正器厂家,连续油管悬挂器,高压双塞水泥头,免钻塞注水泥分级箍,单塞套管水泥头价格,弹性套管扶正器,铸铝钢性扶正器,钢性套管扶正器厂家 | 亚洲一区日韩一区欧美一区a,中文字幕乱妇无码AV在线,欧美日韩免费在线观看,国产精品一区二区三区免费,日韩精品免费一线在线观看,日韩一本在线,国产呦精品一区二区三区下载,国产日韩精品一区二区在线观看,欧美日韩高清一区二区三区,日韩在线免费观看视频,欧美日韩一区在线观看 | 学汽修,汽修培训,西安汽车维修培训学校,西安万通汽车学校[官网] 削片机|木材破碎机|木材粉碎机|模板破碎机|双轴撕碎机_郑州木工机械制造厂 | 陕西筱润智能科技有限公司 干部人事智能档案柜 智能密集架 智能档案柜 部队选层文件智能柜 智能枪弹柜 财务智能档案柜 边防武警智能密集架 医院智能档案柜 部队选层文件智能柜智能枪弹柜 学校医院文件柜 企事业单位公检法智能文件柜 生产厂家-筱润智能科技有限公司 RFID射频智能密集架 全自动智能选层档案柜 智能密保柜 枪柜部队营房营具床桌椅办公家具 办公用品档案盒设备货架 全自动智能选层柜生产厂家-筱润智能科技有限公司 | 气动球阀 - 电动球阀 - 电站阀 - 汗越阀门 | 鑫金牛建设工程(苏州)有限公司 | 太阳能路灯 太阳能路灯厂家 路灯厂家-保定正联光电科技有限公司 太阳能光伏发电_太阳能热水器_空气能热水器_直饮净水器_深圳市大兴节能环保科技有限公司 | 石英砂过滤器_砂滤器_石家庄工泉水处理科技有限公司 | 食品厂净化工程-无尘车间装修改造-净化工程-洁净工程-苏州远盈净化公司 | 昆明护栏网厂家_隔离栅_围栏网_石笼网「13年生产经验」-云南北辛商贸 | 机械设备回收_二手机器回收_设备拆除回收_广州益美机械设备回收公司 | 欧美日韩人妻精品一区二区三区_欧美成人精品欧美一级乱黄_亚洲欧美日韩高清一区二区三区_国产一级做a爰片久久毛片_日韩一级视频在线观看播放_精品一区二区三区免费毛片爱_完整观看高清秒播国内外精品资源 | 天木生物科技有限公司-高通量自动化-细胞筛选平台 | 贴片磁胶电感_一体成型电感_贴片共模电感_广东精密龙电子科技有限公司 | 河北浩元保温材料有限公司 | 砂浆生产线_干混砂浆设备_干混砂浆生产线-苏州一工机械有限公司 砂基透水砖滤水率,防滑性试验仪,砂基透水砖落球冲击,抗冲击试验机-献县中正试验仪器销售处 | 全自动冷冻研磨仪-高通量组织研磨仪厂家-「杭州宋慈智能科技」 | 曙海培训-仿真培训Linux培训html5培单片机培训PCB培训python培训PLC培训C语言培训android培训物联网培训无线电培训欧姆龙培训工业机器人培训5G培训Hadoop培训CFD培训项目外包开发咨询 | 全自动|电加热配液罐,浓缩器厂家-森博百科 | 昆明纸箱厂-礼盒定制-包装盒定做-纸箱厂-云南包掌柜包装有限公司 | 液压支架配件|液压支架立柱|液压支架千斤顶|液压支架换向阀|液压支架乳化油|液压支架密封件-山东卓力生产厂家 | 郑州空气能热水器,郑州空气能热水器经销商,郑州空气能热水器维修,郑州空气能热水器安装 | 开水机-节能开水器-即热式开水器-上海捷水环保科技有限公司 | 洁净无尘棚_万级洁净棚_昆山风淋室-昆山市海兴净化设备 | 桥梁养护|桥梁维修加固|隧道裂缝修补|支座更换|管道堵水气囊|衡水众拓路桥养护有限公司 |