国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Foshan three steel steel truss construction method
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4923

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 欧美一区二区三区久久综合 | 女友闺蜜真湿夹得我好爽小说 | 一区二区三区四区在线免费观看 | 五月天婷婷丁香 | 青娱乐福利| 亚洲欧美手机在线观看 | www亚洲一区 | 日本无卡码一区二区三区 | 天堂在线最新版www中文 | 日本一区二区三区视频在线 | 日日干夜夜拍 | 色婷婷久久 | 日韩a无v码在线播放免费 | 日韩精品视频在线播放 | 日本高清乱码中文字幕 | 久久人人青草97香蕉 | 一个人看的片免费高清大全 | 天堂亚洲国产日韩在线看 | 久久精品视频一区二区三区 | 日日摸夜夜摸无需播放器 | 日本漫画工囗全彩内番怀孕 | 四虎精品永久在线网址 | 日韩成人国产精品视频 | 麻豆观看| 老司机午夜免费影院 | 色天使色婷婷丁香久久综合 | 五月花激情网 | 91看视频| 久久久精品免费国产四虎 | 5151四虎| 欧美性高清极品猛交 | 夜色综合 | 91人人干| 欧美一级特黄刺激大片视频 | 男插女阴道 | 动漫同性女被吸乳羞羞漫画 | 亚洲乱码一二三四五六区 | 日本美女高清在线观看免费 | 欧美性猛交ⅹxxx乱大交免费 | 日本成人一区二区 | 午夜亚洲视频 |