Guangzhou Steel construction technique which span a large space?

Time:[2016-4-20]  Hits:4407

Guangzhou Steel construction technique which span a large space?

 

Guangzhou Steel Slide the laws generally can be divided into two types: structures by supporting sliding method. The following were introduced Guangzhou Steel construction features of the two methods.
 
Slip Method: The basic idea is to structure the whole (or partial) in the first assembly with the conditions of the site assembly forming, re-use sliding systems designed to shift the overall position of installation method. With this installation technology, assembly site and assembly machinery and equipment can be focused on a relatively fixed venues, as compared with in situ mounting method can reduce the amount of temporary support measures and operating platforms, space-saving processing and management costs. First with the structures by which key consideration in the design of the structure of direct construction difficult position, for example outside the periphery of the construction site is limited, can not meet the normal walking across the inner lifting equipment. The basic elements of this construction method is to "enhance the overall engineering," the assembly ground reaction force support, enhancing the overall replaced by "lateral movement", so essentially the same method to enhance the work.
 
At the same time, using this method should at least pay attention to several points: a support structure at the slip in favor of laying the track, slip line length, the higher the efficiency; slip unit should geometric invariant system, slip process is sufficiently rigid and stability, resistance to minimize slippage when. When using multi-point traction slip is achieved, in order to avoid twisting structure during sliding, traction synchronization must be controlled if it is difficult to ensure that, should fully assess the impact calculated by the traction unit is not synchronized to slip caused when necessary, temporary reinforcement of the slip unit. Slip unit before the final fixed structure exists in a direction orthogonal to the direction of movement of "easy slip" trend, because the conditions are different and the design of supports, designed to prevent the outside (ie, the slip plane) of the deformation, it is necessary to take prevent the "fall" of measures, such as setting a rigid rod or flexible cable from the balance on both sides of the support nearby.

In addition, the structure of sliding method further comprises two different processes: Pin slip by, the cumulative slip.
Pin slip by: the slip unit or a Pin Pin composed by a number from one end to the design position, between the sliding unit at high altitude were connected directly to form a unitary structure.
Cumulative slip: slip upcoming unit on the rail just slip some (temporarily moved to the design position) to be connected to the next unit and then slip a distance, and so forth, by Pin accumulated until each unit Pin push to the design position.
In general, large-span space steel structure and installation method, can not be set when the temporary support or the use of a crane to install the poor, that is, direct construction of buildings at the position in question, Slip engineering methods can be used as solutions one.
Supporting sliding method: sliding method is supported in the structural design of the Group erection support frame structure in place in order to provide support for installation and operation of the platform, to be part of the structure of the installation is complete, the support that is already installed sliding structure Bi out. Such is the structure of the adjacent in-situ installation created the conditions, and so on, until the completion of the structure of the overall installation. Thus, with different structures by supporting sliding method can be summarized as "structure does not slip and slide support mechanism" and Slip law is "structural support mechanism does not slip and slide." When using the support sliding method, in addition to the support structure is designed to meet the general global and regional stability, but also consider the level of dynamic load (start-up and braking effect caused by the horizontal inertia force), can be added a large brace if necessary to improve its anti lateral stiffness. To sum up, since this method to be occupied structure across the venue, so when the surrounding environment is difficult to provide a splice site structure supporting sliding method can be used as one solution. It is worth noting that, regardless of the support structure or slip slip method, the sliding track in addition to the conventional linear translation, the slip curve is also not uncommon, frequently used in engineering practice.
 
Enhancing the overall installation method: Installation method to enhance the overall structure is to be installed on the ground floor or a suitable projection assembly forming position, and then use the "lifting system" will enhance the overall upward to an installation method of shaping the design elevation structure. When large-span steel structure height is higher, not conducive to the erection of supporting tire rack, lifting steel shape rules, enhancing the overall construction methods can be employed as an option.

Large-span steel structure cantilevered unsupported installation method: the so-called large-span steel structure cantilevered unsupported installation method that is not in the erection of the support mechanism of the conditions to the stiffness of cantilevered steel body based on the use of mechanical lifting at height parts installation, use and gradually extended phase of the installation way for construction. Relatively high altitude in situ installation method, although the labor law is also in the vicinity of high-altitude Situ installation, but does not entirely because of the temporary support mechanism, measures less construction, the construction process is simple (no unloading). Suitable structural body stiffness, good stability, high height cantilevered steel. With this construction method, by the influence of its own weight, will be cantilevered section under torsion, and the resulting problems is to install the coordinates of an unknown member of the encounter when the mounting position or shape required the presence of the closure case, the bit configuration of the construction process shape control is one of the biggest technical problem, which is directly related to the construction field configuration when completed can meet the requirements, and the cantilevered section smooth closure.
 
Guangzhou Steel for large-span steel structure construction, the original high-altitude air unit installation method, slip mounting method, enhancing the overall law and large span cantilever mounting method is currently unsupported several typical and common construction methods, but its application must grasp conditions and key technical points, in engineering practice, a reasonable choice. Especially in recent years, most of the projects has a unique architectural style, bring many difficulties to the construction in particular installation. A deep understanding of the structure of the composition of these projects, to understand its load transfer path, familiar with the specific requirements of the project area where the ambient conditions and the engineering, construction and available resources and master their own proprietary technology to local conditions to design the most appropriate , get rid of the installation program, it is the pursuit of the highest level of construction technology.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 汇讯WiseUC--连接人与业务,以即时通讯为基础的应用集成平台 | 美国Riverhawk轴承,Riverhawk十字弹簧轴承,Riverhawk联轴器,Riverhawk液压工具 | 一体化净水器-一体化净水设备-集成式|装配式模块化净水设备-山东奕博环境 | 活性炭吸附设备,UV光氧废气处理设备,破碎机专用除尘器,催化燃烧设备厂家-河北碧清环保设备有限公司 | 联智通达_工控一体机_工业触摸一体机_工业一体机_工业触控一体机_POS机主板_工控主板_国产化主板_RK3588主板厂商-联智通达 | 气体报警器,有毒气体报警器,可燃气体探测器,乙炔气体报警器,可燃气体检漏仪,便携式气体检测仪,气体报警控制器-山东如特安防设备有限公司 | 深圳注册公司-工商注册代理-深圳注册公司流程及费用-记帐报税-公司注销-[深圳市悟空企业管理(深圳)有限公司] | 江苏圣博莱自动化科技有限公司| 爬架网@建筑爬架网@冲孔建筑爬架网片@工地冲孔建筑爬架网片@工地冲孔建筑爬架网片厂家@工地冲孔建筑爬架网片生产厂家-安平县诺德金属制品有限公司 | 西安西雷脉冲功率技术有限公司-高压调制器/加速器与脉冲功率系统的研发/生产/应用推广/高压脉冲电源的应用研究/设计/生产和销售/高功率脉冲器件/材料与仪器设备的研发/生产和销售/高电压/大电流/强磁场环境的模拟及测试服务/会议会展服务/货物及进出口的业务/脉冲功率技术领域类的技术转让 | 天空彩票天下彩,天空彩天空彩票免费资料,天空彩票与你同行开奖,天下彩正版资料大全 | 食品厂净化工程-无尘车间装修改造-净化工程-洁净工程-苏州远盈净化公司 | 兰舍硅藻泥 -- 深圳硅藻泥|深圳兰舍硅藻泥|深圳硅藻泥品牌|深圳硅藻泥价格|深圳硅藻泥厂家|深圳硅藻泥施工| | 聚达|聚达物联|聚达物联科技|杭州聚达物联科技有限公司|www.judawulian.com|智慧社区|数字驾驶舱|智慧清运|智慧工地|邻家小达 | 面粉加工成套设备|面粉加工设备|面粉加工机械|面粉机组设备-河南成立粮油机械有限公司 | 直流电机调速器,直流电机控制器,直流电机调速电源-淄博诚铖创惠电子有限公司 | 太原重卡叔叔运输有限公司-山西太原大件运输、太原物流公司、太原货运物流、太原大件运输、太原货运信息、长治物流公司、长治大件运输、晋城物流公司、晋城大件运输、忻州大件运输、朔州大件运输、阳泉大件运输、大同大件运输、吕梁大件运输、临汾大件运输、运城大件运城 | 欧路哲门窗|佛山欧路哲门窗有限公司|专业门窗定制品牌 | 深山工作室提供网络投票系统|微信公众号投票|微信公众号小程序|抖音小程序|百度小程序|微信公众号开发|企业网站建设 | 自恢复保险丝_贴片保险丝_插件保险丝_力特保险丝_力特经销商_SMD贴片保险丝_一次性保险丝厂家—深圳市集电通实业有限公司 | 激光切管机_等离子切管机_相贯线切管机厂家|服务为先-山东美峰智能设备有限公司 | 黄山市惠康膳食管理服务有限公司 - 官网首页 | 自恢复保险丝_贴片保险丝_插件保险丝_力特保险丝_力特经销商_SMD贴片保险丝_一次性保险丝厂家—深圳市集电通实业有限公司 | 螺旋钢管厂家,临沂瑞源工贸有限公司 | 气体泄漏检测仪,COD水质分析仪,RD8200管线探测仪-成都恒通兴业科技有限责任公司 | 自动隔油提升设备,消防稳压一体设备,苏州不锈钢消防水箱,污水提升设备厂家,无负压变频供水设备厂家-苏州脉泉供水设备有限公司 | 深圳社区邦家政公司-保姆_月嫂_育儿嫂 _早教育婴师_家政钟点工_家政培训_家政加盟- 社区邦优质生活服务 专业、标准化、便捷、安心,一站式家庭服务平台,服务专业有保障 ! | 河南桥式起重机-河南门式起重机-宇华起重设备集团(官网) | 种植槽系统,移动苗床,多层种植货架,潮汐苗床,物流苗床,潮汐面板,立体旋转育秧床,河北博超温室设备有限公司 | 蓝禹太阳能蓄电池 风能储能胶体铅酸电池-扬州东泰电源有限公司 | 中国工业网_网络工业品牌 资讯创造价值 | 桁架楼承板_钢筋桁架楼承板厂家-山东新材料科技| 江苏上上电缆集团——上上电缆 上上品质 | 吉林人才网_吉林招聘网_求职找工作平台 | 温州市浙铸机械有限公司| 金刚石砂轮_树脂砂轮片厂家_CBN砂轮批发-华昱金刚石工具 | 磨粉机_上海磨粉机_雷蒙磨粉机_超细磨粉机_磨粉机价格-上海山卓重工机械有限公司 | 维启科技-创造科技的无限可能 | 上海维启信息技术有限公司 建筑仿真 BIM 虚拟现实 VR AR 顶岗实习 建筑智能模型 | 凝汽器换管-胶球清洗装置-二次滤网_连灵动| 天猫代运营_淘宝代运营_正规电商代运营公司_武汉火蝠电商 | 连云港海盛石英科技有限公司 |