Home > News > Housing Construction - large steel structure construction technology of installation of slip
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4545

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 特黄a大片免费视频 | 一级人做人爰a全过程免费视频 | 久久精品国产欧美日韩99热 | 日韩精品一区二区三区不卡 | 欧美巨大肥奶bbw | 成年男女免费视频网站播放 | 热热涩热热狠狠色香蕉综合 | 欧美高跟鞋heeljobtv | 手机看片日韩在线 | 人人狠狠综合久久亚洲 | 免费网站观看 | 日本捆绑调教hd在线观看 | 一本伊人| 久久国产午夜精品理论篇小说 | 成人欧美一区二区三区视频 | 伊人热人久久中文字幕 | 亚州1区2区3区4区产品乱码2021 | 日韩一区二区三区在线免费观看 | 日韩孕交japanese孕交 | 午夜人屠h精品全集 | 亚洲影视精品 | 亚洲成a人片在线观看播放 亚洲成a人片在线观看www | 亚洲欧美日韩国产 | 三级小说在线 | 一本一道波多波多野结衣视频 | 亚洲欧美日韩激情在线观看 | 福利社在线 | 日韩一区二紧身裤 | 五月婷婷六月色 | 97久久国语露脸精品对白 | 日韩视频 中文字幕 | 日本亚洲最大的色成网站www | 日日摸夜夜爽夜夜爽出水 | 亚洲性视频在线 | 中文字幕日本一区波多野不卡 | 老妇换着曰小说 | 久久国产这里只精品免费 | 午夜免费啪在线观看视频网站 | jj视频网站免费 | 一区二区三区在线观看视频 | 伊人三级|