国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Steel Engineering strength bolted connection inspection requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Steel Engineering strength bolted connection inspection requirements

Time:[2016-3-9]  Hits:4472

Steel Engineering strength bolted connection inspection requirements

High strength bolt friction surface should be smooth, dry, iron oxide surface may not have skin, burr, burr, paint and oil, remove loose rust with a wire brush along the direction perpendicular to the force. And shall not be installed in the rain.

Use a torque wrench should be required to calibrate torque wrench set to respond before the class to be checked before using.

Guangzhou Steel in strict accordance to the surrounding extended from the middle of the order, the early implementation of twist, twist the end of the construction technology program, non-step method of direct final twist. A high-strength bolted joint on bolt group should be central to start the installation, one by one tightening, tighten it again each application are different colors of paint be marked to prevent leakage twist. High strength bolts fastening parts order from stiffness to unfettered free end be carried out from the middle to the edges, so that the adhesiveness between the plates.

Should be free to penetrate the high-strength bolts bolt hole. When reaming, iron may not fall into lamellar. Reaming shall not exceed 1/3 of one joint bolt hole, reaming diameter of not greater than 2 mm aperture together. High strength bolts were forbidden to use gas cutting reaming work.

Guangzhou Steel long-term storage of more than six months or improper care caused by rusty bolts and contaminated dirt, may alter the performance of the torque coefficient or bolts of high strength bolts, as the case should be cleaned, rust and lubrication process, and the torque coefficient or bolt pre-tension test, qualified before use.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩美女网站 | 欧美一区二区三区不卡免费观看 | 白白在线观看视频免费观看 | 一二三四在线观看高清在线观看一 | 色久综合在线 | 欧美一级纶理片免费 | 尤物视频网站在线 | 日韩欧美视频在线一区二区 | 日产一一到六区麻豆 | 人妖调教 | 日日操狠狠干 | 女人被草 | 波多野结衣最新2020作品 | 一个人看的www免费动漫视频 | 日产精品一区到六区免费 | 91福利社| 日本xxxxxx片免费播放18 | 日本亚洲天堂网 | 草莓视频破解 | 99热这就是里面只有精品 | 青娱极品盛宴国产一区 | 猫咪官方最新版网址 | 91popn国产激情 | 一级理论片免费观看在线 | 日本视频播放免费线上观看 | 星辰影院在线观看高清免费观看 | 五月婷婷久 | 人人看人人做 | 99精品欧美一区二区三区综合在线 | 成年视频xxxxxx在线 | 扒开女同学的腿嗯啊的叫 | 日韩免费三级 | 日韩精品免费在线观看 | 亚洲剧场午夜在线观看 | 诱惑网综合 | 无码精品一区二区三区免费视频 | 欧美人与牲禽xxxxx | 久久精品小视频 | 性刺激视频在线播放免费 | 日本大乳大乳孕妇交 | 免费日韩在线观看 |