Steel Construction Safety Control handle inquiry

Time:[2015-9-30]  Hits:5357

Guangzhou Steel News: Steel Construction Safety Control handle inquiry

Followed by the development of society, from the steel works is increasingly being recognized economic, practical, seismic, in use, etc., followed with an increase in steel works, steel in construction, production safety questions more outstanding. Steel Construction site safety handle though complicated, but as long as we can to strengthen the control and inspection for the main part of the construction process, so fine, standardized handling, I believe we will be able to ensure the smooth construction of production, orderly and safe conduct .

First, the question of protection analysis and research limb, hole, high job

1, in order to lay the pressure plate, reducing limb, the onset of the hole pressure plate laying steps rubato, adjustment, riveted, laying order starting from the side of the starting point should be laid to the surrounding continuous, that reduce limb, The attack also eliminates the need for hole secure channel (in the main beam and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint job, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying operations should be laid beforehand hanging over the bottom layer of the pressure plate level safety net, rubato, the adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard shall not leak or riveting riveting, riveting and prevent leakage episodes apron phenomenon.

2, limb, hole protection. Of the elevator shaft on the floor or ground plane, tube wells and the surrounding floor and sides of the hole grew to 1.5m surrounding scaffolding pipe erection height of 1.2m protective railings, entrance Hangings retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two Hangings retardant safety net level (ground floor flat on the ground covered with fire-retardant medium dense mesh safety net). Hole, limb protection to ensure the safety of operating personnel, within the hole to prevent the upper level of the network played a material role of junior officers hurt falling. Guangzhou Steel

3, high job protection measures: First Parachute. To prevent falling height, the operator during the height job, it is necessary to use seat belts. Since the steel construction activity when a larger range, use an ordinary seat belt is difficult to meet the construction requirements, should be used with a speed difference from the controller (also known as anti-dropping speed difference or anti-dropping device or buffer) belts. When lifting steel columns and apparatus, in order to ensure that workers removed hoisting rope used in a safe state, by hanging hook safety rope at a height determined in accordance with the site, for hanging safety belt safety catch. When people climb steel ladder, use self-locking device Dropped solve unprotected steel ladder doubt. Self-locking device use should be careful not to hold against; when people climbing, self-locking device is always with fellow construction workers. It is necessary to seat belt hanging on the hook safety catch to prevent the onset of fall accidents. Second, beams, safety rope hanging on steel columns. After more than two fixed solid steel columns, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high of 70mm × 70mm × 7mm used to support the safety rope, and the choice of basket bolt tensioning the safety rope, safety rope to prevent excessive due to security failures. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporary lifting with ladders, choose 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do, do with a 14-round stepladder, ladder width should not be less than 40cm, it is necessary to connect with the steel columns solid, stable, can not shake. Fourth, operating platforms. When the steel beams and support devices, the main girder parts hanging rope security personnel will guard the seat belt hanging rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, in the first paragraph of the steel columns from 1.2m at the top of the column erected platform. Site construction schedule based on the number of platforms to determine and ensure the normal turnover, does not affect the lifting operations. Setting means operating platform for welders to create a good working environment, to ensure the safe operation of the welder. The platform disassembly convenient, safe and reliable, to steel columns docking device, calibration, weld appearance processing, ultrasonic testing and other processes to provide a safe production security.

Second, the material lifting, hoisting questions Analysis and Research

1, means the use of things such as a torque wrench, crowbar, grinder, etc. should be used in safety rope to prevent falling. Readily with bolts and gaskets should be placed in bags of stuff.

2, applied to all jobs in industry, perhaps falling objects should be removed or to be fixed.

3, in the high altitude cutting gas cutting or welding, should take measures to prevent cut metal, bead or sparks falling wounding.

4, in the process of lifting and means, first check the rigging, wire rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe should immediately suspend construction danger to the relevant personnel.

Third, Hot Work Analysis and Research

1, according to the requirements of the two groups with flare when effective fire extinguisher, let someone see the fire, then use spark bucket underneath.

2, oil can not hand contact with oxygen bottles, to prevent the crane or other mechanical oil fell on the oxygen cylinder.

3, oxygen and acetylene bottles necessary to regulate placed above the cylinders set quarantine measures to prevent the ignition of the gas cylinder when the cross-operation. It is necessary to have anti-tempering equipment, electrical welder strictly enforce safety rules when using acetylene bottles.

4, welding operations with Cradle hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other processes to provide a safe production security.

5, then the use of spark fighting. In order to prevent accidents and fires caused by scalding attack sparks of welding and cutting, it is necessary to set up high-altitude welding sparks fight then, using rockwool fire-retardant materials inscribed spark fighting then melt beads, bead prevent splashing out again energize plate .

Fourth, the construction of steel structures means that other safety measures Analysis and Research

Strict implementation of safety devices handle steel construction systems and safety procedures, standards, norms, and do all the security measures to crack "Sambo, four" protection. Strict implementation of the provisions of the safe use of electricity. Erection of scaffolding aerial work safety, safety fence and safety nets for protection, workers necessary to wear seat belts. Steel construction lifting equipment work area should be set up alert line, as a clear sign, and let someone serve. In addition to the safety rope hanging on steel beams, steel columns outside, in limb protection in the floor when not kept pace with the limb, the hole to set the alert line of red and white, and set up warning signs in the limb at the floor (height operation it is necessary to hang up the seat belt or safety slogans, etc.). Non-construction personnel hoisting operation is prohibited into or through lifting area. Trial before the formal lifting cranes, lifting equipment inspection job situation, ropes, anchor points. After confirmation, before the official lifting. Smooth lifting action, when more than one hoist operation together, start aborted concerted action to prevent the workpiece vibration and swing. After leveling the time to find a positive place, the work can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take safety measures, and enhance on-site guard, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel apparatus construction hoisting personnel necessary to stick to their posts, obey the command to listen to the unified command, to not immediately clear signal should ask, non guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations and codes. The main component lifting should be done in the morning, the other lifting operations should be carried out during the day, at night to prevent the job. Night work is necessary to have adequate and reliable lighting. Wind prohibited in four and four more were lifting, rain and snow can not be carried out lifting operations. When hoisting steel apparatus construction, construction workers below the workpiece can not, force a nearby rope and other dangerous places to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable safety measures and approved by the relevant responsible person. Member hoisting should fitters, electricians and other lifting equipment as protection equipment, cut off the power to suspend operations should ensure. All steel construction means construction workers necessary to wear safety helmets, aerial work necessary to have seat belts. Do not drink and steel industry means jobs and production facilities whim, forced prohibited illegal operation. Guangzhou Steel

V. Conclusion

As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state of the hole, limb, like height operation; professional construction workers and engineering staff are at the height of the handle intensive interchange work environment ; the whole engineering components and construction equipment, materials and various safety features of the equipment and materials required special hoisting, lifting, etc., to bring it difficult to handle the construction safety. Therefore, strengthening the construction of steel safety handle is particularly important.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 重庆自考网-重庆自学考试 | 小地磅,钢瓶秤,叉车称,轮椅秤,倒桶秤,畜牧秤,轴重仪,称重模块——上海实干实业有限公司-网站首页 | 苏州不锈钢_江苏不锈钢_江苏不锈钢板_苏州模具钢_苏州合金钢_苏州特种合金_苏州不锈钢板_304不锈钢棒_苏州塞硒五金制品有限公司 苏州ERP定制|苏州CRM|苏州OA|苏州BPM|进销存管理系统-苏州中尚信息科技有限公司 | 压力变送器,差压变送器,液位变送器,温度变送器生产厂家价格-西安仕乐克仪表科技有限公司 | 上海钧尚电器有限公司 - Faulhaber电机 AMETEK pittman电机 AMETEK ROTRON军用航空风机 Exlar电动缸 MAE电机 MCG电机 CP电动工具 马头工具 AMCI驱动器 直流电机 减速箱 直流伺服电机,无刷电机,直线电机 直流防爆电机 防爆电机 汽车助力转向电机 EPS电机 faulhaber motor faulhaber gearbox NANOTEC电机 ELWOOD电机 PHYTRON电机 EXLAR伺服电动缸 高力矩、高性能直流电机,音圈电机,风机,直流风机,航空风机 | 深圳汽车贴膜_深圳全车车身改色贴膜|UPPF隐形车衣官网 | 沥青灌缝胶-路面贴缝带-灌缝胶厂家-山东晟辉工程材料有限公司 | 塑料桶生产厂家-山东塑料桶-化工塑料桶-200升塑料桶-山东欣越塑料制品有限公司 | 扭力扳手_扭力扳手检定仪_数显扭力扳手_扭力测试仪_测力计_推拉力计_拉力测试仪_测试台架-上海实干实业有限公司 | 生活污水处理设备-地埋式污水处理设备厂家-山东梦之洁水处理设备有限公司 | 精密铸造,精密铸件,不锈钢铸造,不锈钢铸件-常州鸿雁行机械科技有限公司 | 合肥食品检测-安徽卫生检测-水质检测机构-安徽金标准检测研究院有限公司 | 液晶拼接屏_三星46寸/55寸/LG液晶拼接屏_深圳拼接墙厂家_电视大屏幕液晶拼接_高清工业级液晶监视器 | 皮带输送机-宁津县浩发链条有限公司 | 舟舟宝贝少儿培训网-少儿艺术培训-少儿舞蹈培训-少儿英语培训 | 湿电电源,静电除尘电源,电捕焦电源-山东仕瑞电气科技有限公司 | 球墨井盖厂家-铸铁井盖批发-雨水篦子生产厂家-安徽含山县林头新华铸造厂 | 讨债公司_要债公司_要账公司[18年讨债要债经验]讨账公司 | 强德防盗门-防盗门厂家-中国防盗门十大品牌-强德门业 - 浙江臻品工贸有限公司 | 台车炉厂家_台车式退火炉_台车式回火炉—安徽大新工业炉有限公司 | 上海建发物资有限公司| 上海钧尚电器有限公司 - Faulhaber电机 AMETEK pittman电机 AMETEK ROTRON军用航空风机 Exlar电动缸 MAE电机 MCG电机 CP电动工具 马头工具 AMCI驱动器 直流电机 减速箱 直流伺服电机,无刷电机,直线电机 直流防爆电机 防爆电机 汽车助力转向电机 EPS电机 faulhaber motor faulhaber gearbox NANOTEC电机 ELWOOD电机 PHYTRON电机 EXLAR伺服电动缸 高力矩、高性能直流电机,音圈电机,风机,直流风机,航空风机 | 石墨热场|PECVD石墨舟|碳碳框|燃料电池双极板|半导体石墨|光纤用石墨模具|石墨电极加工|石墨制品|上海弘竣新能源材料有限公司 | 智慧环保大数据云平台_车载走航式扬尘/恶臭/噪声污染源在线监测管控信息系统平台_环保土壤/环境监测系统云平台-奥斯恩智能科技 | 双层恒温培养箱|智能振荡培养箱-常州市仪都百科 | 苏州探测器清洗_烟感探头清洗_感烟探测器维修清洗_火灾探测器清洗报价/价格_进口国产消防设备清洗_江苏智淼探测器清洗厂家- | 河南康振机械有限公司 | 小地磅,钢瓶秤,叉车称,轮椅秤,倒桶秤,畜牧秤,轴重仪,称重模块——上海实干实业有限公司-网站首页 | 河北热风机,电热暖风机,燃油暖风机,工业暖风机厂家安装,批发-河北嘉鹏冷暖风机有限公司 | 履带式移动破碎站-移动筛分站-移动碎石机-破碎机_山东奥凯诺矿机 | 自动超声波清洗机_五金超声波清洗机厂家_超声波模具价格_东莞劲荣自动化 | 一体化净水器-一体化净水设备-集成式|装配式模块化净水设备-山东奕博环境 | 汽车标签|医疗标签|电子标签|手机电池标签|电脑电池标签|电源标签|耐高温标签|防静电标签|手机出厂膜|手机全裹膜|手机包裹膜|手机卖点膜|热转印标签|遮阳板标签|天势科技|-标签印制专家! | 陕西散花照明-西安太阳能路灯,陕西太阳能路灯,西安太阳能路灯厂家,陕西太阳能路灯厂家 | 西安汉信丨条码打印机,条码扫码枪,条码标签,条码仓库管理系统专业供应商 | 智能化解决方案 智能家居 家庭影院 灯光音箱 会议室报告厅 剧场剧院 指挥中心 大数据中心_沈阳天哲科技有限公司 | 铅板-济南鑫玉防辐射材料有限公司 | 唐山搬家公司-搬家公司电话价格-四通搬家 | 四川超声波清洗机厂家-旋转喷淋清洗机设备-成都鑫荣诚超声波科技有限公司 | 昆明纸箱厂-礼盒定制-包装盒定做-纸箱厂-云南包掌柜包装有限公司 | 新2025澳门天天开好彩生肖对照表,2025新澳精准正版免费,2025新澳今晚开奖资料大全,新澳门四肖期期准免费,新澳门今晚9点30分开奖结果 |