国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5543

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 500福利国产精品导航在线 | 久久看精品 | 91porn地址| 欧美一级视频精品观看 | 色吊丝最新永久免费观看网站 | 天天色踪合合 | avzaixian| 青青在线播放 | 亚欧三级| 久久综合九色综合97欧美 | 午夜国产精品久久影院 | 自拍三区播 | 俺也来国产精品欧美在线观看 | 欧洲美女高清一级毛片 | 在线另类| 日本人xxxⅹ18hd19hd | 青草网在线观看 | 日本天堂在线视频 | bbbb成人毛片免费看 | 日本免费色网站 | 亚洲美女性视频 | 涩综合| 中文字幕在线看片成人 | 亚洲成a人片在线观看中文动漫 | 殴美毛片| 在线看片欧美 | 亚洲国产欧美日韩 | 中文字幕高清免费不卡视频 | 亚洲免费在线视频观看 | 久久久不卡国产精品一区二区 | 久久精品国产99欧美精品亚洲 | 中日综合在线 | 欧美亚洲欧美 | 成人国产欧美精品一区二区 | 午夜成年免费观看视频 | 伊人久久婷婷丁香六月综合基地 | 日本网站在线 | 手机看日韩片 | 亚洲第5页 | 久久99免费| 日韩视频不卡 |