Guangzhou Steel tells you: Management of Steel Construction Safety Control

Time:[2015-7-23]  Hits:5348

Guangzhou Steel tells you: Management of Steel Construction Safety Control

 


Along with the development of society, steel works from an economic, practical, seismic, may increasingly being recognized in the use and so on, followed with an increase in steel works, steel in construction, production safety problem is getting outstanding. Steel Construction site safety management in spite of the complex, but as long as we can to strengthen the control and inspection for the main part of the construction process, so fine, standardized management, I believe that we will be able to ensure the smooth construction of production, orderly and safe conduct . Guangzhou Steel

First, the limb, the hole, protection problems working height analysis and discussion

1, the pressure plate in order to lay, cut limb, the hole generating pressure plate laying steps rubato, adjustment, riveted, laying sequence should start from the side of successive start laying the perimeter, that is to cut the limb, hole generation also eliminates the safety channel (the main beams and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint work, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying work should be laid at the bottom of the pressure plate beforehand hanging over one level safety net, rubato, adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard not leak riveting or staking, riveting avoid leakage occurs apron appearance.

2, limb, hole protection. Plane or on the ground floor of the elevator shaft on the periphery of tube wells and the floor and sides of the hole grew to 1.5m periphery with a height of 1.2m scaffolding erection of protective railings, entrance hanged retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two hanged retardant safety net level (ground floor flat on the ground covered with flame retardant online Dense mesh safety net). Hole, limb protection to ensure the safety of staff, the hole in the flat screen play to avoid falling material injury to the upper junior staff role.

3, protective measures height works: First Parachute. To avoid falling height, the operator during high places, it is necessary to use seat belts. Since the steel construction when a large scope of activities, the selection of the general seat belt is difficult to meet the construction requirements, should be used with the speed difference from the controller (also known as anti-dropping speed difference or buffers or anti-dropping) seat belt. When lifting steel columns and apparatus, in order to ensure that workers in a safe state by removing the hoisting rope, the hook by hanging ropes at a height determined according to the site, for hanging seat belt safety catch. When people climb the steel ladder, use self-locking device Dropped solve the problem of unprotected steel ladder. Use self-locking device should pay attention not hold against; when people climb, self-locking device with construction workers always counterparts. It is necessary to seat belt hanging on the hook safety catch to avoid falling accidents. Second, beams, safety rope hanging on steel columns. After more than two fixed steel columns stability, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high 70mm × 70mm × 7mm for supporting a safety rope, and the choice of basket bolt tensioning the safety rope, safety rope to avoid too long cause fail-safe. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporarily lifting with the ladder, the choice of 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do with a 14-round do stepladder, ladder width should not be less than 40cm, it is necessary to connect with the steel columns for solid, stable, can not shake. Fourth, operating channels. When the steel beams and the support means, the main steel beams hung site safety rope, they will hang in a protective belt rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, from the first stage in the erection of the steel column capitals 1.2m operating channels. Site construction schedule based on the number of channels determined to ensure that the turnover is normal, does not affect the lifting work. Setting means operating channels to welders to create a good working environment, to ensure safe operation of the welder. The channel dismantling convenient, safe and reliable, to steel columns docking device, proofreading, weld appearance processing, ultrasonic testing and other processes guarantee the supply of safe production.

Second, the material lifting, hoisting problem analysis and discussion

1, means the use of tools such as a torque wrench, crowbar, grinder, etc. safety rope should be used, to avoid falling. Readily with bolts and gaskets should be placed in the tool bag.

2, the construction work in all possible falling objects should be removed or to be fixed.

3, in the high altitude cutting gas cutting or welding, should take measures to avoid cut metal, bead or sparks falling wounding.

4, in the process of lifting and means, first check the rigging, rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe condition should immediately report the officer to stop the construction.

Third, Hot Work Analysis and discussion

1, according with the requirements of the two groups when the flare fire extinguisher, let someone see the fire, then use the bucket underneath spark.

2, the hand must not touch the oxygen cylinder oil, to avoid the crane or other mechanical oil fell on the oxygen cylinder.

3, oxygen and acetylene bottles have the necessary standards placed above the cylinders set the isolation measures to avoid cross-ignited gas cylinders working. If necessary, the use of acetylene bottle with anti-tempering device, strict implementation of electrical welder safety procedures.

4, welders role Basket hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other production processes provides a safety guarantee.

5, then the use of spark fighting. To avoid scalding accidents and fire sparks produced by welding and cutting, welding and cutting height it is necessary to set up contact spark bucket, use rockwool fire-retardant material inscribed spark fighting then melt beads, bead avoid splashing out again energize plate .

Fourth, the steel unit construction analysis and discussion of other security measures

Strict implementation of the steel unit construction safety management systems and safety procedures, standards, criteria, and do all the security measures, strict, "Sambo, four" protection. Strict implementation of the rules of safe use of electricity. Working at Height Safety erection of scaffolding, safety barriers and safety nets for protection, the staff necessary to wear a seat belt. Lifting steel unit construction work area should be located cordon, as a clear sign, and let someone responsible. In addition to the safety rope hanging on steel beams, steel columns, the limb should protect not kept pace with the limb in the floor, the hole set cordon of red and white, and set up warning signs in the limb at the floor (height work it is necessary to hang your seat belt or safety slogans, etc.). Hoisting prohibited into or through non-construction personnel lifting area. Trial before the formal lifting cranes, lifting equipment inspection work, ropes, anchor points. After confirmation, before the official lifting. Smooth lifting action, when more than one hoist work together, starting and stopping concerted action to avoid the workpiece vibration and swing. Time to find a place after being leveled, the workpiece can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take safety measures, and enhance on-site surveillance, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel construction lifting equipment necessary staff remained at their posts, obey the command to listen to the unified command, to not immediately clear signal should ask, non guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations, standards. The main component lifting should be done in the morning, the other lifting work should be carried out during the day, avoid work at night. Night work is necessary to have sufficient reliable lighting. Wind prohibited in four and more than four hoisting, nor sleet weather hoisting work. When hoisting steel apparatus construction, construction personnel shall not below the workpiece, the force with neighboring ropes and other dangerous places to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable safety measures and approved by the relevant person in charge. Member hoisting should fitters, electricians responsible for the maintenance lifting machinery equipment, cut off the power to stop working should be ensured. All steel construction means construction workers necessary to wear helmets, high-altitude work necessary to have seat belts. Do not drink and steel unit construction work and production whim, forced prohibited illegal operation.

V. Conclusion

As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state hole, limb, like high places; professional construction and project management staff are at a high concentration of interchange work environment ; the whole engineering components and construction equipment, materials and various security facilities material characteristics required special hoisting, lifting, etc., to their construction safety management difficult. Therefore, the strengthening of steel construction safety management is particularly important. Guangzhou Steel

 

Along with the development of society, steel works from an economic, practical, seismic, may increasingly being recognized in the use and so on, followed with an increase in steel works, steel in construction, production safety problem is getting outstanding. Steel Construction site safety management in spite of the complex, but as long as we can to strengthen the control and inspection for the main part of the construction process, so fine, standardized management, I believe that we will be able to ensure the smooth construction of production, orderly and safe conduct . Guangzhou Steel

First, the limb, the hole, protection problems working height analysis and discussion

1, the pressure plate in order to lay, cut limb, the hole generating pressure plate laying steps rubato, adjustment, riveted, laying sequence should start from the side of successive start laying the perimeter, that is to cut the limb, hole generation also eliminates the safety channel (the main beams and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint work, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying work should be laid at the bottom of the pressure plate beforehand hanging over one level safety net, rubato, adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard not leak riveting or staking, riveting avoid leakage occurs apron appearance.

2, limb, hole protection. Plane or on the ground floor of the elevator shaft on the periphery of tube wells and the floor and sides of the hole grew to 1.5m periphery with a height of 1.2m scaffolding erection of protective railings, entrance hanged retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two hanged retardant safety net level (ground floor flat on the ground covered with flame retardant online Dense mesh safety net). Hole, limb protection to ensure the safety of staff, the hole in the flat screen play to avoid falling material injury to the upper junior staff role.

3, protective measures height works: First Parachute. To avoid falling height, the operator during high places, it is necessary to use seat belts. Since the steel construction when a large scope of activities, the selection of the general seat belt is difficult to meet the construction requirements, should be used with the speed difference from the controller (also known as anti-dropping speed difference or buffers or anti-dropping) seat belt. When lifting steel columns and apparatus, in order to ensure that workers in a safe state by removing the hoisting rope, the hook by hanging ropes at a height determined according to the site, for hanging seat belt safety catch. When people climb the steel ladder, use self-locking device Dropped solve the problem of unprotected steel ladder. Use self-locking device should pay attention not hold against; when people climb, self-locking device with construction workers always counterparts. It is necessary to seat belt hanging on the hook safety catch to avoid falling accidents. Second, beams, safety rope hanging on steel columns. After more than two fixed steel columns stability, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high 70mm × 70mm × 7mm for supporting a safety rope, and the choice of basket bolt tensioning the safety rope, safety rope to avoid too long cause fail-safe. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporarily lifting with the ladder, the choice of 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do with a 14-round do stepladder, ladder width should not be less than 40cm, it is necessary to connect with the steel columns for solid, stable, can not shake. Fourth, operating channels. When the steel beams and the support means, the main steel beams hung site safety rope, they will hang in a protective belt rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, from the first stage in the erection of the steel column capitals 1.2m operating channels. Site construction schedule based on the number of channels determined to ensure that the turnover is normal, does not affect the lifting work. Setting means operating channels to welders to create a good working environment, to ensure safe operation of the welder. The channel dismantling convenient, safe and reliable, to steel columns docking device, proofreading, weld appearance processing, ultrasonic testing and other processes guarantee the supply of safe production.

Second, the material lifting, hoisting problem analysis and discussion

1, means the use of tools such as a torque wrench, crowbar, grinder, etc. safety rope should be used, to avoid falling. Readily with bolts and gaskets should be placed in the tool bag.

2, the construction work in all possible falling objects should be removed or to be fixed.

3, in the high altitude cutting gas cutting or welding, should take measures to avoid cut metal, bead or sparks falling wounding.

4, in the process of lifting and means, first check the rigging, rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe condition should immediately report the officer to stop the construction.

Third, Hot Work Analysis and discussion

1, according with the requirements of the two groups when the flare fire extinguisher, let someone see the fire, then use the bucket underneath spark.

2, the hand must not touch the oxygen cylinder oil, to avoid the crane or other mechanical oil fell on the oxygen cylinder.

3, oxygen and acetylene bottles have the necessary standards placed above the cylinders set the isolation measures to avoid cross-ignited gas cylinders working. If necessary, the use of acetylene bottle with anti-tempering device, strict implementation of electrical welder safety procedures.

4, welders role Basket hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other production processes provides a safety guarantee.

5, then the use of spark fighting. To avoid scalding accidents and fire sparks produced by welding and cutting, welding and cutting height it is necessary to set up contact spark bucket, use rockwool fire-retardant material inscribed spark fighting then melt beads, bead avoid splashing out again energize plate .

Fourth, the steel unit construction analysis and discussion of other security measures

Strict implementation of the steel unit construction safety management systems and safety procedures, standards, criteria, and do all the security measures, strict, "Sambo, four" protection. Strict implementation of the rules of safe use of electricity. Working at Height Safety erection of scaffolding, safety barriers and safety nets for protection, the staff necessary to wear a seat belt. Lifting steel unit construction work area should be located cordon, as a clear sign, and let someone responsible. In addition to the safety rope hanging on steel beams, steel columns, the limb should protect not kept pace with the limb in the floor, the hole set cordon of red and white, and set up warning signs in the limb at the floor (height work it is necessary to hang your seat belt or safety slogans, etc.). Hoisting prohibited into or through non-construction personnel lifting area. Trial before the formal lifting cranes, lifting equipment inspection work, ropes, anchor points. After confirmation, before the official lifting. Smooth lifting action, when more than one hoist work together, starting and stopping concerted action to avoid the workpiece vibration and swing. Time to find a place after being leveled, the workpiece can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take safety measures, and enhance on-site surveillance, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel construction lifting equipment necessary staff remained at their posts, obey the command to listen to the unified command, to not immediately clear signal should ask, non guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations, standards. The main component lifting should be done in the morning, the other lifting work should be carried out during the day, avoid work at night. Night work is necessary to have sufficient reliable lighting. Wind prohibited in four and more than four hoisting, nor sleet weather hoisting work. When hoisting steel apparatus construction, construction personnel shall not below the workpiece, the force with neighboring ropes and other dangerous places to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable safety measures and approved by the relevant person in charge. Member hoisting should fitters, electricians responsible for the maintenance lifting machinery equipment, cut off the power to stop working should be ensured. All steel construction means construction workers necessary to wear helmets, high-altitude work necessary to have seat belts. Do not drink and steel unit construction work and production whim, forced prohibited illegal operation.

V. Conclusion

As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state hole, limb, like high places; professional construction and project management staff are at a high concentration of interchange work environment ; the whole engineering components and construction equipment, materials and various security facilities material characteristics required special hoisting, lifting, etc., to their construction safety management difficult. Therefore, the strengthening of steel construction safety management is particularly important. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 履带底盘-橡胶履带底盘-无线遥控底盘-德州力维智能装备有限公司 铝压铸件_铝合金压铸件_铝合金压铸件厂家-安平县长虹压铸厂 | 泥浆振动筛|卧式泥浆搅拌器|泥浆离心机|泥浆处理固控设备_沧州宏宇石油机械有限公司 | 艺术网 - 大型艺术类权威门户站 艺考培训-中影人教育 【官网】-中国艺考教育的引航者 | 伸缩机厂家-现货快递物流伸缩皮带机|装车输送机-乐清市华森自动化设备有限公司 | 医药招商 千虹医药网-专业的医药招商-医药代理-药品招商-药品代理信息发布平台 | 宁波刑事辩护律师-建设工程律师-工程款合同律师-喻明辉律师 | 铝合金热处理设备_天然气铝棒加热炉_QPQ热处理设备-浙江长兴天源炉业科技有限公司 | 康拓威技术(深圳)有限公司|Theia镜头代理商|安讯士AXIS摄像机|安讯士监控系统|博世BOSCH监控|博世会议系统|索尼SONY监控|松下PANASONIC监控|三星韩华SAMSUNG监控|霍尼韦尔Honeywell|海康|大华|华为监控|Theia无畸变镜头|AXIS监控|安讯视摄像机 | 小程序商城,_电商系统源码,直播商城定制开发电商系统源码,电商系统,java电商系统 | 山东万通液压股份有限公司-自卸车专用油缸,能源采掘设备油缸,机械装备用油缸,油气弹簧,工程机械油缸,液压元件 | 直流屏|青岛直流屏|直流屏电池-世界500强艾默生直流屏标准生产厂家赛里斯能源科技有限公司 | 淮南网站制作丨淮南做网站丨淮南网络公司丨淮南哪家网络公司好丨淮南智讯网络 | 铜陵耐火砖|铜陵耐火浇注料|铜陵耐火材料|铜陵市金钟物资经营部【官网】 | 柚墨yomoer官网_PPT模板_工作总结PPT模板下载_个人简历模板 | 品牌策划-品牌设计-济南之式传媒广告有限公司官网-提供品牌整合丨影视创意丨公关活动丨数字营销丨自媒体运营丨数字营销 | 泰安兴润建材有限公司,泰安井盖定做,泰安警示桩定做,泰安雨水篦子定做,泰安操场篦子定做,泰安标志牌定做 | 戒网瘾学校-陕西正规戒网瘾-叛逆青少年教育学校-重生教育官网 | 浙江中拓教育设备有限公司| 气密仪-气密性检测仪-气密性测试仪-苏州莱和电子科技有限公司 | 快速卷帘门-电动卷帘门-快速堆积门-快速门厂家-任丘市康速机电设备有限公司 | 潍坊网络推广,临沂360推广,东营360推广,枣庄360推广,潍坊网站建设,潍坊网络公司,潍坊360搜索,潍坊APP开发,潍坊360推广,潍坊360代理,潍坊点睛网络科技有限公司 | 上海纳美鞋业有限公司 | 组合包装箱,折叠包装箱,烟台木箱,烟台包装箱-烟台顺达包装有限责任公司 | 图页网-无线压力电容变送器_激光测厚传感器_电磁流量计_温控调节仪 | 心理咨询室设备_音乐放松椅_心理测评系统_情绪宣泄设备厂家 | 塑木地板-木塑地板厂家「云南昆明楚雄曲靖玉溪塑木地板」云南云冶中信塑木新型材料有限公司 | 泊头市特种油泵阀制造有限公司 - 渣油泵,重油泵,沥青泵,高压齿轮泵,煤焦油泵,导热油泵,三螺杆泵,圆弧齿轮泵,不锈钢齿轮泵, | 卡压式管件_不锈钢卡压式管件_双卡压管件_不锈钢沟槽管件_承插焊管件_温州市中达阀门管件有限公司 | 深圳理津技术有限公司(REHLOGY)-全球工业品供应商:自动化产品|仪器仪表|设备|备品备件|工具|消耗品|非标设备|建筑工程等一站式综合服务! | 振动给料机_电磁振动给料机_振动给料机厂家-新乡市大汉振动机械有限公司 | 模具配件加工厂|东莞模具配件加工|模具配件加工厂|精密塑胶模具配件|东莞市优迪精密模具制品有限公司 | 中国焊接协会网站—中国焊接信息网;焊接行业最权威访问量最大的专业网站:焊接信息、焊接材料,焊接机器,焊接设备,焊机,焊材,辅助设备,焊机配件,仪器仪表,电动工具,钎焊,送丝机,表面处理,自动化专机,焊锡丝,助焊剂 | 科衣洛定制衣柜,书柜,厨柜,衣帽间,电视柜,酒柜,餐厅柜,门厅柜,鞋柜——科衣洛全屋定制官网 | 微型电磁阀_隔膜泵_活塞泵_微型水泵_微型真空泵_微型气泵【东莞市宗旨电子科技有限公司】 | 景德镇古窑民俗博览区-国家AAAAA级旅游景区_全国旅游标准化示范景区_国家文化产业示范基地_国家级非物质文化遗产生产性保护示范基地--官方网站 | 九江赛璐珞实业有限公司-赛璐珞板,赛璐璐板材,PVC装饰膜,PVC片材,醋酸纤维胶板_多彩装饰材料生产厂家 | 数控落地镗铣床_数控刨台式镗铣床_数控龙门加工中心-青岛辉腾机械设备有限公司 | 圆柱模板_圆柱木模板_方柱加固件_建材板材网 | 中山电子控制板|中山工业控制板|中山市云禾电子科技有限公司 | 無谷轻食官网_沙拉轻食加盟_轻食加盟总部_轻食加盟费用 | 通用变频器|国产变频器|深圳变频器厂家-深圳市英捷思技术有限公司 |