Guangzhou Steel teach you: Steel Construction Safety Control handle Exploration

Time:[2015-7-8]  Hits:4803

Guangzhou Steel teach you: Steel Construction Safety Control handle Exploration

With the development of society, the steel works from an economic, practical, seismic, may increasingly being recognized in the use and so on, along with the increase in steel works, steel in construction, production safety questions increasingly The more prominent. Steel Construction site safety handle though complex, but as long as we can for the main part of the construction process to strengthen the control and view, so fine, standardization handle, I believe we will be able to ensure the smooth construction of production, orderly and safe conduct . Guangzhou Steel
First, limb, hole, high work protection questions Analysis and Research
1, the pressure plate sequentially laying, reduce limb, the hole generating pressure plate laying steps rubato, adjustment, riveted, laying order starting from the side of the starting point should be laid to the surrounding continuous, that reduce limb, hole generation also eliminates the safety channel (the main beams and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint work, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying work should first lay hanging over the bottom layer of the pressure plate level safety net, rubato, adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard not leak riveting or staking, riveting prevent leakage phenomenon occurs apron.
2, limb, hole protection. Plane or on the ground floor of the elevator shaft on the periphery of tube wells and the floor and sides of the hole grew to 1.5m periphery with a height of 1.2m scaffolding erection of protective railings, entrance hanged retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two hanged retardant safety net level (ground floor flat on the ground covered with flame retardant online Dense mesh safety net). Hole, limb protection to ensure the safety of staff, the hole in the flat screen acts to prevent injuries to the upper material fall lower personnel role. Guangzhou Steel
3, the height of the protective measures work: First Parachute. To prevent falls, the operator during the height of work, it is necessary to use seat belts. Since the steel construction at a large range of activities, seat belt use is generally very difficult to meet the construction requirements, should use safety belts with a speed difference from the controller (also known as anti-dropping speed difference or anti-dropping device or buffer). When lifting steel columns and apparatus, in order to ensure that workers in a safe state by removing the hoisting rope, the hook by hanging ropes at a height determined according to the site, for hanging seat belt safety catch. When people climb the steel ladder, we use self-locking device fall solve steel ladder without maintenance questions. Use self-locking device should pay attention not hold against; when people climb, self-locking device with construction workers always counterparts. It is necessary to seat belt hanging on the hook safety catch to prevent fall incidents. Second, beams, safety rope hanging on steel columns. After more than two fixed solid steel columns, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high 70mm × 70mm × 7mm used to support the safety rope, and the use of baskets bolt tensioning safety rope, safety rope to prevent long cause fail-safe. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporary lifting with ladders, choose 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do with a 14-round do stepladder, ladder width should not be less than 40cm, it is necessary to link up with steel columns solid, stable, can not shake. Fourth, operating platforms. When the steel beams and support equipment, the main steel beams hung site safety rope, they will hang in a protective belt rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, at a distance of 1.2m at the top section of the steel column capitals erected platform. Site construction schedule based on the number of platforms to determine and ensure the normal turnover, does not affect the lifting work. Setting means operating platform for welders build a good working environment, to ensure the safe operation of the welder. The platform disassembly convenient, safe and reliable, to steel columns docking device, proofreading, weld appearance processing, ultrasonic testing and other production processes provides a safety guarantee.
Second, the material lifting, hoisting questions Analysis and Research
1, means the use of tools such as a torque wrench, crowbar, grinder, etc. should be used to maintain security rope to prevent falling. Readily with bolts and gaskets should be placed in the tool bag.
2, the construction work of all objects that could fall, should be removed or to be fixed.
3, in the high altitude cutting gas cutting or welding, approach should be taken to prevent the cut metal, bead or sparks falling wounding.
4, in the process of lifting and devices, the first view the rigging, rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe condition should immediately stop the construction and to the relevant personnel.
Third, Hot Work Analysis and Research
1, according with the requirements of the two groups when the flare fire extinguisher, let someone see the fire, then use the bucket underneath spark.
2, oil can not hand contact with oxygen bottles, to prevent the crane or other mechanical oil fell on the oxygen cylinder.
3, oxygen and acetylene bottles have the necessary standards placed above the cylinders set the isolation means, to prevent cross-ignited gas cylinders working. If necessary, the use of acetylene bottle with anti-tempering device, strict implementation of electrical welder safety procedures.
4, welders role Basket hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other production processes provides a safety guarantee.
5, then the use of spark fighting. To prevent the welding sparks produced by cutting and fire incidents caused by scalding incidents, it is necessary to set up high-altitude Welding sparks fight then, using rockwool fire-retardant material inscribed spark fighting then melt beads, bead prevent splashing out again energize plate .
Fourth, the steel unit construction approach to security analysis and other research
Strict implementation of safety devices to handle system of steel construction and safety procedures, standards, criteria, and do the security approach, strict "Sambo, four" protection. Strict implementation of the provisions of the Security of electricity. Working at Height Safety erection of scaffolding, safety barriers and safety nets for protection, the staff necessary to wear a seat belt. Lifting steel unit construction work area should be located cordon, as a clear sign, and let someone responsible. In addition to the safety rope hanging on steel beams, steel columns, the limb should protect not kept pace with the limb in the floor, the hole set cordon of red and white, and set up warning signs in the limb at the floor (height work it is necessary to hang your seat belt or safety slogans, etc.). Hoisting prohibit non-construction personnel into or through the lifting area. Trial before the formal lifting crane to see the work of lifting equipment, ropes, anchor points. Recognition is correct, before the official lifting. Smooth lifting action, when more than one hoist work together, start and stop the action to be coordinated together, preventing workpiece vibration and swing. Time to find a place after being leveled, the workpiece can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take timely approach to security, and enhance on-site surveillance, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel construction lifting equipment necessary staff remained at their posts, obey the command to listen to the unified command, to not immediately clear signal should be asked to prohibit guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations, standards. The main component lifting should be done in the morning, the other lifting work should be carried out during the day to prevent work at night. Night work is necessary to have sufficient reliable lighting. Wind prohibited hoisting four and four above, rain and snow nor hoisting work. When hoisting steel apparatus construction, construction personnel shall not below the workpiece, the force rope with neighboring and other dangerous place to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable approach to security and the consent of the person in charge. Member hoisting should fitters, electricians responsible for the maintenance lifting machinery equipment, cut off the power to stop working should be ensured. All steel construction means construction workers it is necessary to wear helmets, high-altitude work necessary to have seat belts. Ban drink means the construction work and the production of steel whim, ban forced illegal operation.
V. Conclusion
As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state hole, limb, like high places; professional construction workers and engineering staff are at the height of the handle intensive interchange work environment ; the whole engineering components and construction equipment, materials and various safety features of the equipment and materials required special hoisting, lifting, etc., to the safety of its construction makes it difficult to handle. Therefore, strengthening the construction of steel safety handle is particularly important. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 热熔钻孔机【优质厂家】_多年热熔钻设备研发制造经验 | 种植槽系统,移动苗床,多层种植货架,潮汐苗床,物流苗床,潮汐面板,立体旋转育秧床,河北博超温室设备有限公司 | 全自动包装机械设备_液体灌装机-迈驰日化包装流水线厂家 | 联系我们果博东方公司福布斯客服电话 | 潲水回收-成都山河环境卫生管理有限公司 | 模型公司|沙盘公司|优选杭州景文模型设计有限公司 | 郑州腾飞建设工程集团有限公司| 碎料机_拌料机_吸料机_温控箱_烤料斗_模温机_东莞索亿塑料破碎机厂家 | 钻机配件-岩心管-岩心管接箍-地质套管-煤矿用钻头-河南滨远机械设备有限公司 | 济南诚润达贸易有限公司 - 专注专营巴斯夫防冻冷却液 | 山东向阳电子科技有限公司-多用户集中式电能表生产厂家,NB物联网水表,刷卡水电表生产厂家,泰安智能水电表价格 | 质检报告_COC_CE认证_LFGB测试_REACH_FCC_FDA-冠通检测 | 化工网-化工新闻资讯平台-中华化工行业门户网站 | 影像测量仪|检测设备定制|平面度测量仪|三坐标测量机|广州市海科思自动化设备有限公司-400-0528-668 | 小鼠实验(试验)用臭氧发生器_进口臭氧发生器 - 北京同林臭氧实验网 | 上海机械加工-机械加工-精密机械加工-上海欧野精工机械有限公司 上海慧泰仪器制造有限公司_一体型马弗炉-可控真空干燥箱-强光稳定性试验箱 | 中式婚礼_汉服婚礼_传统婚礼_婚庆公司_云歌婚礼策划【官网】 | 硬度计,里氏硬度计,布氏硬度计,高强螺栓检测仪,平板导热仪,专业无损检测仪器商-北京时代新天测控技术有限公司-北京时代新天测控技术有限公司 | 上海希喆机械有限公司-Schunk雄克,雄克卡盘, 雄克机械手, B+R贝加莱, ELCIS编码器,艾西斯编码器, TWK编码器,Nexen,Joyce dayton升降机,Thomson汤姆森,TPG减速机,INA导轨。 | 深圳办公室装修_办公室设计_写字楼装修设计_深圳市加洲建设集团有限公司 | 呼吸家官网|肺功能检测仪生产厂家|国产肺功能仪知名品牌|肺功能检测仪|肺功能测试仪|婴幼儿肺功能仪|弥散残气肺功能仪|肺功能测试系统|广州红象医疗科技有限公司|便携式肺功能仪|大肺功能仪|呼吸康复一体机|儿童肺功能仪|肺活量计|医用简易肺功能仪|呼吸康复系统|肺功能仪|弥散肺功能仪(大肺)|便携式肺功能检测仪|肺康复|呼吸肌力测定肺功能仪|肺功能测定仪|呼吸神经肌肉刺激仪|便携式肺功能 | 吸音板_隔音板多少钱_降噪声学材料_环保阻燃防火_吸声装饰工程定制_厂家价格直供 - 佛山天阶声学材料厂 | 幼儿园设计公司/南昌酒店装修/办公室/餐厅/民宿/店面/展厅/装修设计公司-益昌装饰集团 | 在线式风速仪_直读式流速仪-北京亚欧德鹏科技有限公司 | 青砖厂家,青瓦价格-河北祥庆烧结瓦有限公司 | 深圳同步带轮_东莞齿轮加工_东莞同步轮厂家-东莞东城精胜机械配件厂 | 生物安全柜检测,GMP设备确认,仪器性能确认,洁净厂房检测,仓储温湿度检测-上海熙迈 | 化工招聘网 化工人才网|化工英才网-化工企业招聘首选网站 | 形创(CREAFORM)3D扫描仪|三维检测|三维数字化处理|3D设备租赁|3D打印|——北京中显恒业仪器仪表有限公司 | 拉布机_全自动拉布机_全自动拉布机厂家-江苏拉布机械科技有限公司 | 数海经纬官方网站 - 声学智能领域先行者 - 数海经纬(深圳)信息技术有限公司 | 天津佳创博为科技有限公司|AGV控制器|无人搬运车|磁导航传感器|AGV专业零配件 | 苏州注塑|无锡注塑|上海注塑|苏州汉科精密注塑有限公司 | 有用的旅游攻略_格林旅行网 | 泰安兴润建材有限公司,泰安井盖定做,泰安警示桩定做,泰安雨水篦子定做,泰安操场篦子定做,泰安标志牌定做 | 矿用三环链|锻打/焊接三环链|矿车万能环|三环链销子-济宁卓力工矿设备有限公司 | 样品前处理仪器_光谱仪器_色谱/分析仪器_测量/计量仪器_青岛聚创世纪环保科技有限公司 | 无锡新源润不锈钢官网|304不锈钢平板|316L冷轧宽幅|2米卷分条开平 | 吸污车|吸粪车|冷藏车|消防车|清障车|环卫垃圾车价格|湖北程力汽车集团厂家销售公司 | 商业地产策划_商业地产代理_华锦亿爵商业地产顾问机构 | 塑胶篮球场施工|塑胶网球场施工|幼儿园塑胶施工|石家庄亚强体育公司 |