1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4898

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青草资源站 | 视频在线精品 | 久久美女福利视频 | 天天躁日日躁成人字幕aⅴ 天天躁日日躁 疯人影院 | 欧美在线tv| 亚洲a级毛片 | 在线看欧美日韩中文字幕 | 亚洲二区在线 | 麻豆视频网站在线观看 | 最近日本免费观看视频 | 欧美在线视频免费 | 在线看亚洲| 久久精品国波多野结衣 | 久久青青国产 | 色综合久久久久久久 | 一区二区在线欧美日韩中文 | 又粗又大又爽又色又过瘾视频 | 先锋资源色 | 恋梦空间第一季完整版免费观看 | 午夜啪啪免费视频 | 在线播放91灌醉迷j高跟美女 | 高清国产一区 | 每日更新国产精品视频 | 91精品国产综合久久久 | 久久精品国产乱子伦多人 | 久久久久久久91精品免费观看 | 成人欧美精品久久久久影院 | 亚洲码和乱人伦中文一区 | 日本一本在线 | 日本色www | 4080午夜| 日韩大片免费在线观看 | 御书屋免费自由阅读器官网 | 伊人高清视频 | 青青草原国产 | 两个人看的www高清免费资源 | 天天干女人 | 3p叠罗汉国产精品久久 | 草莓向日葵秋葵番茄丝瓜大全未满18 | 欧美疯狂性受xxxxx喷水更猛 | 亚洲白嫩在线观看 |