Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5250

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 99精品欧美一区二区三区 | 亚洲国产日韩欧美在线a乱码 | 日本亚洲视频 | 亚色网址 | 久久综合精品不卡一区二区 | 999香蕉视频 | 伊人网在线观看 | 涩涩久久| chinese辛倾gay| 日本午夜视频 | 三级黄色在线视频 | 欧美性69式xxxx护士 | 亚洲国产一 | 中文字幕在线日本 | 四虎在线免费 | 日韩国产欧美一区二区三区在线 | 开小箩莉嫩苞h嗯嗯好疼小说 | 色老大综合久久综合热 | 中文字幕在线看片成人 | 久久依人 | 男子摸100个不戴胸罩的美女 | 天天夜天干天天爽 | 屁屁影院在线播放 | 天天色天天操天天 | 9uu最新网址 | np高h肉辣灌浆男男 narutopixxx玖辛奈足控 | 午夜看片网| 欧美一级在线观看 | 麻豆片免费观看在线看 | 亚洲国产精品久久精品成人 | 亚洲精品一二三四区 | 日韩一级片免费观看 | 亚洲一区免费在线 | 在线青草 | 张柏芝在线观看 | 午夜看片在线 | 免费理论片在线观看 | 免费岛国小视频在线观看 | 青娱乐国产盛宴 | 深爱婷婷激情网 | 性荡视频播放器在线视频播放 |