Key control points for steel structure engineering supervision work

Time:[2023-8-16]  Hits:1661

01

 

Qualification review of construction units

 


Due to the strong professionalism of steel structure engineering, there are high requirements for professional equipment, processing sites, workers' quality, as well as the construction technology standards, quality assurance system, quality control and inspection system of the enterprise itself. Generally, it is mostly subcontracted under the general contract. In this case, the qualification and management level of the construction enterprise are quite important. Therefore, qualification review is an important link, and its review content includes:


(1) Whether the construction qualification and business scale meet the engineering requirements. (2) Whether the construction technical standards, quality assurance system, quality control and inspection system meet the requirements of engineering planning technical indicators. (3) Inspect whether the production capacity of the construction enterprise meets the requirements of the project schedule.

 

02

 

Review of Welder Qualifications

 


Welders must pass the exam and obtain a certificate of qualification, and certified welders must perform welding on their approved projects and scales. (1) Number of views: All views (on-site personnel). (2) Inspection method: Check the welder's qualification certificate, its recognized scale, and validity period.

 

03

 

Drawing review and technical preparation

 


According to the drawing review procedure in the supervision plan, understand the drawings before the start of the project, convene and preside over the drawing review by professional technical personnel from the planning, owner, supervisor, and construction unit. Based on the planning documents and related materials and standards, address any errors, omissions, irrationality, non compliance with standards, and national construction documents in the construction drawings before construction. Coordinate with the owner, planning, and construction units to determine specific treatment measures or plan optimization for drawing issues. Urge the construction unit to organize the minutes of the joint review, and distribute them to all units after all parties sign and stamp them.

 

04

 

Review of construction organization planning (plan)

 


(1) Urge the construction unit to prepare a special construction organization plan (plan) in accordance with the construction contract. After approval by its superior unit, it shall be reported to the supervisor. (2) After review, if the construction organization plan (plan) needs to be changed during construction, the reason and content of the change must be reported to the supervisor and the construction unit for review and approval before the change can be made.

 

05

 

Regular meetings

 


Organize and participate in a weekly construction site meeting jointly attended by the construction, construction, and supervision units to promptly solve construction problems.

 

06

 

Key points for specific control of steel structure engineering preparation work

 


(1) According to the Unified Standard for Construction Quality Inspection of Building Engineering GB50300-2013 and the Standard for Construction Quality Inspection of Steel Structures GB50205-2020, as a sub project, it is divided into sub projects such as steel structure welding, fastener connection, steel parts and steel component processing, steel component assembly, steel structure pre assembly, steel structure device engineering, profiled metal plate, steel structure coating, etc Regarding the raw materials of steel structures (including steel, welding materials, coating materials, etc.), they have a significant impact on the quality of steel structures and are separately included in the steel structure standards.

(2) Check the welder qualification certificate, its recognition scale, and validity period.

(3) The construction party shall conduct welding process evaluation on the steel, welding materials, welding methods, welding heat treatment, etc. used for the first time, and determine the welding process based on the evaluation report. The supervisor has reviewed all the welding process qualification reports and reviewed them according to the planned weld quality level standards. (4) Before installing steel components, check the positioning axis (bay size and span size) and elevation of the building, as well as the standards and fastening of embedded parts, which should meet the planning requirements. (5) When the embedded steel plate on the reinforced concrete bracket top of the engineering column is directly used as the bearing surface of the steel component, the allowable error in the position of the embedded steel plate on the bearing surface should comply with the standard regulations. (6) Steel components should comply with planning requirements and the provisions of this standard. The deformation and coating detachment of steel components caused by transportation, stacking, and lifting should be corrected and modified. (7) The supporting surface of steel components should not be less than 70% of the contact surface between the top and the embedded steel plate surface, and the maximum gap at the edge should not be greater than 0.8mm. (8) Before painting, the surface of the steel should be embroidered in accordance with the planning requirements and current national standards. The treated steel surface should not have welding slag, welding scars, dust, oil stains, water, and burrs. (9) The coating, number of coating passes, and coating thickness should all meet the planning requirements, with an allowable error of -25mm. The allowable error for each layer of dry paint film thickness is -5mm. (10) The appearance of components should not be painted incorrectly or missed, and the coating should not peel or rust back. The coating should be uniform and free from obvious wrinkles, sags, pinholes, and bubbles. (11) According to the actual situation and structural form of the project, the division of inspection batches for each sub project is determined: 1) Steel structure welding sub project: for the project, each frame can be used as an inspection batch; Inspection batches can also be divided into several inspection batches based on different types of steel structure units or components combined with steel structure production and device sub items. 2) Fastener connection sub project: For the project, inspection batches can be divided based on different steel structure units and fasteners of different standards. 3) Steel parts and components processing: Steel parts and components can be divided into several inspection batches according to different types. 4) Steel component assembly: For large steel structures, the steel components produced by the factory need to be assembled into steel components as lifting units before lifting. Due to the high requirements for component assembly, several components can be used as one inspection batch based on the actual situation on site. 5) Steel structure pre assembly: For disorderly shaped steel structures, in order to ensure smooth assembly during high-altitude installation, pre assembly between relevant components needs to be carried out on the ground after production. Inspection batches can be divided according to the assembly between similar components as one inspection batch. 6) Steel structure installation: Steel structure installation can be divided into single-layer steel structure installation sub items or multi-layer and high-rise steel structure installation sub items. Single story steel structure installations can be divided into several inspection batches according to engineering zoning. Multi story and high-rise steel structure installation projects can be divided into one or several inspection batches according to the floor or construction section. 7) Molded metal plate engineering: Molded metal plate engineering includes molded metal plates used for roofs, wall panels, floor slabs, and other areas. From the material perspective, it can be divided into profiled steel plates with anti-corrosion coating on the surface, profiled aluminum plates, etc. It can be divided into one or several inspection batches based on deformation joints, floors, construction sections, or roofs, walls, floors, etc. 8) Steel structure coating engineering: The steel structure coating engineering includes anti-corrosion coating and fireproof coating. The division of inspection batches can be divided into one or several inspection batches according to the principles of steel structure production or steel structure installation engineering inspection batches. (12) The quality inspection content and corresponding qualification standards of sub projects should comply with the following provisions: 1) Steel structure welding, fastener connection, steel parts and components processing, steel component assembly, steel component pre assembly, steel structure device, profiled metal plate, steel structure coating and other sub projects should comply with the qualified quality standards; 2) Quality control materials and documents should be complete; 3) The inspection and witness testing results related to safety and function should meet the requirements of the corresponding qualified quality standards in GB50205-2020 standard;

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 厦门电脑维修_上门维修电脑_笔记本电脑维修_办公设备维修 - 耐诚 | 上海汽车音响_上海汽车隔音降噪_上海汽车音响改装店_上海音豪 | 宿州电机维修厂家,大型电机维修及二手电机修理到安徽鑫瑞特电机装备有限公司 | 内蒙古碧云食品有限公司| 庭院大门,铝艺大门厂家,别墅庭院大门「免费设计」汉兰达庭院门厂家 | 篮球场围网|网球场围网|球场围网|体育场围网_安平县炎煌丝网制品有限公司 | 济南海纳特科技有限公司| 上海纳美鞋业有限公司 | 廊坊金星化工有限公司-钢套钢保温管厂家,玻璃钢缠绕保温管,镀锌铁皮保温管厂家,廊坊金星化工有限公司 | 叶片泵,液压电机,油泵电机,变量叶片泵,油压电机-广东俊泰液压科技有限公司 | 轻型防化服|重型防化服|全封闭防化服|济南三安安全防护设备有限公司 | 数控机床市场网-专业的数控机床网站 | 汽车漆|汽车油漆|工业油漆涂料|汽车漆加盟-佛山市科涂涂料有限公司 | 智能化会议系统|多媒体会议系统|无纸化会议系统|会议音箱|高清视频会议终端|智能化会议室|会议系统|视频会议系统-深圳市航视达科技有限公司 | 河南专升本-河南省统招专升本| 绝缘纸板-3240环氧板-酚醛布板-FR4环氧板-沈阳友达绝缘材料有限公司 | 徐州恒铭机械设备有限公司_装载机配件_压路机配件_起重机配件_挖掘机配件_配件_徐州恒铭机械设备有限公司 | 亚洲一区日韩一区欧美一区a,中文字幕乱妇无码AV在线,欧美日韩免费在线观看,国产精品一区二区三区免费,日韩精品免费一线在线观看,日韩一本在线,国产呦精品一区二区三区下载,国产日韩精品一区二区在线观看,欧美日韩高清一区二区三区,日韩在线免费观看视频,欧美日韩一区在线观看 | 深圳社区邦家政公司-保姆_月嫂_育儿嫂 _早教育婴师_家政钟点工_家政培训_家政加盟- 社区邦优质生活服务 专业、标准化、便捷、安心,一站式家庭服务平台,服务专业有保障 ! | 南京样本设计,彩页制作,宣传册设计,画册设计印刷,包装设计公司,南京台历制作 | 垃圾桶_垃圾桶厂家_临沂市旭宏塑料有限公司 | 宁波华路德|交通信号灯|交通信号机|太阳能信号灯|交通警示灯|交通信号灯厂家 | 蒸汽孔板流量计-法兰式孔板流量计-一体化标准孔板流量计-金湖中原仪表有限公司 | 吉安仁济医院「官网」吉安男科医院-吉安仁济男科医院靠谱吗-男性专科医院 | 型煤锅炉进煤机|型煤链条炉排 |重型板链除渣机 |丹东刮板输送机|丹东脱硫除尘器-铧洋机械 | 系统门窗加盟_门窗十大品牌_欧享门窗官网 | 什木坊全屋定制官网_木门|护墙|衣柜|橱柜等全品类定制家具 | 网络广播_公共广播系统_校园,学校数字ip,itc智能广播系统方案 | 小鼠实验(试验)用臭氧发生器_进口臭氧发生器 - 北京同林臭氧实验网 | 济宁市泓世新型建材有限公司,山东ALC墙板,GRC轻质隔墙板,预制化粪池,复合墙板加工厂家 | 一站式管材,型材,板材,焊接加工等工程材料批发商-佛山市佛孟钢铁有限公司 | 太原重卡叔叔运输有限公司-山西太原大件运输、太原物流公司、太原货运物流、太原大件运输、太原货运信息、长治物流公司、长治大件运输、晋城物流公司、晋城大件运输、忻州大件运输、朔州大件运输、阳泉大件运输、大同大件运输、吕梁大件运输、临汾大件运输、运城大件运城 | 钎头_球齿钎头_一字钎头 - 铜陵狮达矿山机械有限公司 | 新密耐火材料厂家价格-河南郑州荣盛窑炉耐火材料有限公司 | 煤泥烘干机,酒糟烘干机,药渣烘干机,酵母烘干机,烘干机厂家-瑞奥新能源 | 气胀轴丨安全夹头丨电磁制动器丨纠偏系统丨磁粉离合器丨张力控制器厂家- 东莞天机通信科技有限公司 | 文学素材,好词好句,正能量句子,百科知识-素文网 | 孝感东方妇科医院_孝感妇科医院哪家好_孝感人流多少钱 | 青岛大倾角输送带厂家_橡胶挡边输送带_波纹状挡边输送带_大倾角输送带型号-青岛朗森橡胶有限公司 | 上海上市答谢酒会_企业年会_新品上市发布会_周年/开业庆典_会议会务_活动策划布置演出公司 | 数据采集卡_北京科尔特兴业测控技术研究所 |