Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2527

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 香蕉国产综合久久猫咪 | 高清在线观看视频 | 波多野结衣在线影视免费观看 | chinese耄耋老性 | 日日爽夜夜 | 最新精品亚洲成a人在线观看 | 天天弄天天操 | 美女脱内衣18下看禁止免费 | 日韩激情视频在线 | 日韩在线手机看片免费看 | 蜜桃avav在线 | 日本免费高清一区 | 日韩黄色网 | 亚色一区 | 二区视频在线 | 天堂网www在线资源中文 | 日本色www | 一级@片 | 疯狂伦交小说200篇 风间由美中文 | 伊人久久国产精品 | 免费精品国产自产拍在 | 中文字幕一精品亚洲无线一区 | 非洲黑人老妇女配种视频播放 | chinese国产人妖视频 | 一级一片一a一片 | 中国同性男男gayxxxx免费的 | 欧美一区二区三区美人 | 日本久久99| chinese同志gay露脸飞机 | 婷婷六月丁| 法国性迷宫dvd | 久久这里只有精品免费播放 | 日韩精选 | 深夜视频在线观看免费 | 伊人久久免费 | 欧美日韩第一页 | 自拍偷拍 欧美日韩 | 在线视频观看亚洲 | 在线视频国产99 | 成人影院天天5g天天爽无毒影院 | 婷婷四房综合激情五月性色 |